The short answer: order new trade show displays 4 to 6 weeks before your show. Our standard turnaround is about 10 days from artwork approval, but design, proofs and shipping add time, and many shows need your freight at their warehouse a week or more before move-in. If you only need new graphics for a frame you already own, 3 weeks is usually enough. For January and February shows, start in early December, because the holidays shorten everyone’s calendar.
Work backward from your show date
Here is the timeline we recommend for a new booth. Count back from the day you need the display at the venue, not the day the show opens.
| Before the show | What to do |
|---|---|
| 6 weeks | Confirm your booth size, read the exhibitor manual for height limits and fire rules, and set a budget. |
| 5 weeks | Request a quote and pick your displays: backwall, counter, banner stands, tablecloth, flags. |
| 4 weeks | Send your logo and artwork, or have our team lay out the design. |
| 3 weeks | Approve the final proof. Production starts, with about 10 days to finish. |
| 1 to 2 weeks | Your display ships to you, your office or the show’s advance warehouse. |
| Show week | Set up, check every graphic, and keep the shipping cases for the trip home. |
What adds time
Artwork that isn’t ready
The clock starts at artwork approval, not at the first email. Have a vector logo (AI, EPS or PDF) and your headline decided before you ask for a proof.
Proof changes
Each round of edits can add a day or two. Get the people who need to sign off to look at the first proof, not the third.
Advance warehouse deadlines
Many shows use a freight contractor with an advance warehouse deadline before move-in. Your exhibitor manual lists the date. Miss it and you may pay extra to ship straight to the show floor. Our shipping guide covers how to pack and send a display safely.
The holidays
If your show is in January or February, the weeks around Christmas and New Year’s go fast for everyone: designers, approvers, carriers and print shops. Plan to approve artwork by mid-December. Our office is closed December 24 and 25, and January 1.
Plan by show season
- January and February shows: start in early December and approve artwork before the holidays.
- March and April shows: start in January. This is a busy time for trade show orders, so earlier is better.
- Outdoor season (May onward): order tents, flags and inflatables in March or April so you’re ready for the first market or race.
Already have a display? Reprints are faster
If you own a tension fabric frame or a banner stand from us, you can usually reprint just the fabric graphic. That costs less and ships faster than a new display, and it is the easiest way to update a message for a new year or a new product.
Short on time?
Rush production is available on many products. Simple items, such as banner stands, tablecloths and replacement graphics, are the easiest to speed up. Larger booth builds need more time. Call us with your show date and we will tell you honestly what can make it. For more ideas, read our guide to last-minute trade show displays.
Your pre-order checklist
- Booth size and type (inline, corner or island)
- Show rules: height limits, hanging signs, fire-rated fabric
- Logo files and the one headline you want people to read
- The date the display must arrive, and where it ships
- Your budget, and whether you’ll reuse the display at future shows
Order your spring 2027 displays with Zodiac
Born in Denver in 2014, Zodiac Event Displays has designed and delivered trade show booths, backwalls and event displays ever since. Send us your show date and booth size, and we reply to quote requests within 1 hour during business hours. Starting now means the best choice of materials, time for a proof you’re happy with, and no rush fees.